Skip to content

Continuous Improvement

Close Kaizen Actions by Verifying the Change

A Kaizen action is complete when the change is implemented and its intended effect is checked. Ordering a rack, writing a draft instruction, or scheduling training are milestones, not necessarily closure.

State the action as an observable result

Replace vague actions such as “fix labels” with a specific condition: approved location labels match the system for the pilot area and pickers can locate the selected parts. Include an owner, due date, and method of verification.

Keep the original problem visible beside the action. This helps the team recognize when an activity is finished but the problem remains.

Separate implementation from effectiveness

A hypothetical replenishment action might introduce a collection point for Kanban cards. Implementation means the point exists, is labeled, and is included in training. Effectiveness means signals are collected and replenishment occurs as intended during normal shifts.

Use two simple states when useful: implemented and verified. This prevents a completed purchasing or maintenance task from being mistaken for a sustained operating result.

Make unresolved barriers explicit

If an action is blocked, identify the decision or resource needed and the person responsible for resolving it. Repeatedly moving the due date without explaining the barrier weakens the review process.

Distinguish actions that are overdue from actions that no longer fit the evidence. A test may reveal a different cause. Revise the plan openly instead of completing an obsolete task to protect the dashboard.

Review at the process

Observe the changed method with its owner. Ask employees to demonstrate the new standard and explain exceptions. Check whether instructions, materials, and responsibilities remain aligned after the event team has moved on.

Use a small set of operational measures to evaluate effectiveness. Counting closed actions can describe workload, but it cannot establish better flow, quality, or delivery. The review should end with an understanding of what works, what remains uncertain, and who owns the next step.

Continue reading: 5S That Improves the Work, Not Just the Appearance.